Hoppa till innehållet

Skidbladner

Eolus has applied to the Government for permission to build the Skidbladner offshore wind farm, with up to 147 wind turbines located just over 20 kilometers north of Gotska Sandön and approximately 100 km southeast of Stockholm in the Baltic Sea. In november 2024 the Government rejected 13 offshore projects in the Baltic Sea. Skidbladner was among those.

Type

Offshore wind power

Phase

Planning

Market

Sweden

Annual electricity production

11.7 TWh

Quick facts

Name

Skidbladner

Number of units

max 147 st

Project area

1400 km²

Total unit height

max 360 m

Planned COD

2033

About the Project

Update: In november 2024 the Government rejected 13 offshore projects in the Baltic Sea. Skidbladner was among those. Read more here

Eolus is applying to establish  the offshore windfarm in the Baltic Sea within the Swedish Exclusive Economic Zone (EEZ). The park plans to build max. 147 floating wind turbines just over 20 km north of the island Gotska Sandön. Skidbladner Floating Wind could potentially produce 11.7 TWh of electricity per year,  which corresponds to half of today’s electricity consumption in Stockholm County or more than ten times Gotland’s electricity needs.

The Skidbladner Floating Wind will consist of wind turbines mounted on the floating foundations, which will be anchored to the sea bottom. The permit application concerns wind turbines with a maximum height of 360 meters.

Eolus Applies for Permit for Offshore Wind Power – Equivalent to Renewable Electricity for Half of Stockholm County – Eolus

Choose market

Global

  • Svenska
  • English
  • Local

  • Suomi
  • Polski
  • Latviešu
  • North America